Maximum flexibility, maximum efficiency and short installation times are obtained with the intelligent modular system developed by Kaiser. The components are preassembled in the factory, reducing building time on site, as well as the staff and crane costs, by up to 80%. The series bunkers can be installed in order to increase the capacity up to 320 m³.
Current Projects
- Strabag
Austria - Österreichische Betondecken Arge
Austria - Cemex Hungaria
Hungary - Wopfinger Transportbeton
Autstria