- Row bunkers, 5 compartments
- Silos for binding agents 3x 100 to (1 divided)
- Dosing and weighing systems
- Conveying skip hoist to the mixer
- Double shaft mixer BHS DKXS 2,5
- Control system Dorner
-
- Conveying system with 4 bunkers (20m³), vertical conveyor and rotating belt
- Storage of aggregates 600m³ - 7 compartments
- Silos for binding agents 4 x 100 to (1 divided)
- Double shaft mixer BHS Type DKXS 3,0 with equipments
- Electric installation
- Dosing and weighing system for additives
- Fresh concrete reclaimer system
-
- Conveying system with discharge conveyor, bucket conveyor 230 m³/h
- Silos for binding agents 3x 120 to (1 divided)
- Construction as modular system
- Double shaft mixer BHS DKXS 4,5 with equipment
- Dosing and weighing systems
- Mobile concrete reclaimer unit
-
- Pre-silo with closing cap
- Silos for binding agents 4x 117 to (2 divided)
- Double shaft mixer BHS DKXS 3,33 with equipment
- Control system Dorner
- Fresh concrete reclaimer unit
-
- Storage of aggregates 360 m³ - 6 compartments
- Silos for binding agents 3x 60 to (1 divided) + 1x 120 to
- Double shaft mixer BHS DKXS 2,5
- Dosing and weighing systems
-
- Discharge bunker 60 m³
- Conveying system with high declivity belt, reversible belts, ...
-
- Spare parts for a conveying belt of 200 m
- Driving station and tensioning station
-
- Spare parts for the existing vertical conveyor
-
- Addition and extension of silos for binding agents 2x40 m³ coming from Göllersdorf
-
- Binding agents silo 1x80 to
- Dosing system for binding agents
- Electric installation
-
- Binding agents silo 80m³ with metallic underconstruction
- Dosing system
- Electric installation and integration to the command system
-
- Mechanical installation of a batching plant
-
- Double shaft mixer BHS 2,25 with accessories
- Electric installation